Maintenance Object Repair Procedures
555-233-123
10-372
Issue 4 May 2002
Power Unit Recycle Test (#126)
This test is destructive.
This test is destructive because it requires all circuit packs in the recycled carrier
to be removed and inserted. These actions cause all calls originating or
terminating on circuit packs in this carrier to be dropped. The pair of power units in
the specified carrier is recycled. Both power units in the carrier are turned off for
two seconds and then back on again. After the power units have been turned
back on, the test queries the Maintenance/Tape Processor in Standard system
PPN, the Duplication Interface circuit pack in a PPN for a system with High or
Critical Reliability, or the EPN Maintenance circuit pack in an EPN multicarrier
cabinet system for the status of pair of power units in the specified carrier. If both
power units are on and functioning, then the test passes. If both power units are
not on and functioning, the test fails, and BOTH power units are turned off.
Table 10-141.
TEST #126 Power Unit Recycle Test
Error Code
Test
Result
Description/Recommendation
1000
ABORT
System resources required to run this test are not
available.
1. Retry the command at 1-minute intervals a
maximum of 5 times.
2. If the test continues to abort, escalate the problem.
1129
ABORT
Only occurs when recycling carrier 2B. Indicates that the
Active Tone-Clock for the EPN is in carrier 2B.
1. Issue the set tone-clock 2A command.
2. Rerun the test.
1130
ABORT
Only occurs when recycling carrier 2B. Indicates that the
Active Expansion Interface Link for the EPN is in carrier
2B.
1. Issue the set expansion-link A01 command.
2. Rerun the test.
Continued on next page
Summary of Contents for Definity SI
Page 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Page 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Page 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Page 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Page 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Page 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...