
Maintenance Object Repair Procedures
555-233-123
10-316
Issue 4 May 2002
Table 10-125.
TEST #629 BRI Layer 3 Query
Error
Code
Test
Result
Description/Recommendation
1005
ABORT
The endpoint’s MIMs Supported? field is administered to “no.”
1. Use the change station extension command to change
the parameter only if the endpoint documentation reflects
support for ISDN-BRI Management and Maintenance
Procedures.
1113
ABORT
The signaling link between the switch and the endpoint or
adjunct is down.
1. Use the test port PCSSpp long command to clear any
errors which prevent establishment of the signaling link.
2. Examine the results of Test #626, which is executed with
the command. If this test aborts or fails, follow the repair
procedure for the Signaling Link Status Test.
3. Escalate problem if BRI Layer 3 Query Test continues to
abort.
1139
ABORT
The Packet Bus in the port network is out-of-service.
1. Follow the repair procedures for the Packet Bus.
2. After completing Step 1, execute the test port long
PCSSpp command, and review the results of the BRI Port
Local LAN Loop Around Test to verify the repair.
1141
ABORT
The PKT-CTRL is out-of-service.
1. Consult the repair procedure for PKT-CTRL (Packet
Control Circuit Pack) Maintenance documentation.
1144
ABORT
The PPN Packet Bus is out-of-service.
1. Follow the repair procedures for the Packet Bus in the
PPN.
2. After completing Step 1, execute the test port long
PCSSpp command, and review the results of the BRI Port
Local LAN Loop Around Test to verify the repair.
Continued on next page
Summary of Contents for Definity SI
Page 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Page 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Page 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Page 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Page 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Page 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...