
test trunk
Issue 4 May 2002
8-493
555-233-123
test trunk
This command performs hardware diagnostic tests on an entire trunk group or an
individual trunk group member, depending on the options entered.
Action/
Object
Qualifier
Qualifier Description
Logins
Defaults
Feature
Interactions
test
trunk
group
number
member
number
short
long
repeat
number
clear
schedule
Administered group number (1-99)
Administered number identifying a particular
trunk within a trunk group (1-99).
Command executes a series of
nondestructive diagnostic tests.
Command executes a more comprehensive
and longer version of the both destructive
and nondestructive diagnostic tests.
How many times each test in the sequence is
repeated (1-100)
This option causes the test sequence (short
or long) to repeat until the alarm (if any) is
cleared or a single test in the sequence fails.
1
Command is validated and then a scheduling
form displays to schedule execution of the
command. The command is then placed in
the command queue and is executed at the
specified time. The information displayed by
the command is sent to the system printer
instead of the screen.
2
Examples:
test trunk 78 l
test trunk 80/1 sh r 2
test trunk 78/2 l r 25
test trunk 78/2 l r 25 schedule
test trunk 80
test trunk 80 schedule
test trunk 78 r 4
test trunk 78 c
1
If no alarms are registered against the maintenance object then the test sequence exercises once. The long
clear option forces a clear of all alarms if no errors are encountered during testing. The short clear option only
clears alarms pertinent to tests in the short sequence.
2
Refer to the Report Scheduler and System Printer feature specification for more details.
init
inads
craft
cust
Test Seq. =
short;
Repeat = 1
none
Summary of Contents for Definity SI
Page 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Page 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Page 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Page 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Page 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Page 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...