
Maintenance Object Repair Procedures
555-233-123
10-148
Issue 4 May 2002
1024
ABORT
Announcement circuit pack blocked the test because an
announcement download is in progress. If an announcement
download is in progress, a status data-module
<announcement data extension> command should show
that the announcement data port is connected to a NETCON
data channel, and [for G3iV1.1-286] the tape drive should be
active or [for G3sV2, G3iV2-386, or G3vsV2] the “card-in-use”
amber LED for the memory card should be on (to determine
the extension of the announcement data module, use the list
data-module command). See Note (a) at end of table for
more information.
1. Wait until download is finished (can take up to 45
minutes), and then run the test again.
2. If the test continues to abort and there is no download in
progress, escalate the problem.
2000
ABORT
Response to the test request was not received within the
allowable time period. If Error Type 1538 is present in the
Error Log, follow the maintenance strategy recommended for
this error type.
1. Retry the command at one minute intervals a maximum of
5 times.
2007
ABORT
The Announcement circuit pack thinks that Port 1 or Port 9 is
busy.
1. Retry the command at 1-minute intervals a maximum of 5
times.
2. If the test continues to abort, follow the Announcement
Port maintenance procedures for Ports 1 and 9.
3. If the Announcement ports pass all their tests, escalate
the problem.
2100
ABORT
Could not allocate the necessary system resources to run this
test.
1. Retry the command at 1-minute intervals a maximum of 5
times.
Table 10-48.
TEST #210 140AY Loop Around Test — Continued
Error
Code
Test
Result
Description/Recommendation
Continued on next page
Summary of Contents for Definity SI
Page 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Page 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Page 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Page 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Page 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Page 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...