
DATA-CHL (Data Channel)
Issue 4 May 2002
10-497
555-233-123
1000
ABORT
Error Code of 1000 can mean one of several things:
a. The target DATA-CHL is busy and, therefore, not available
for use.
b. Could not allocate the necessary system resources to run
this test.
c. Internal system error
If the results of Tests #110 and #111 are both PASS, then there is
a high probability that the target DATA-CHL is not defective.
Proceed with the remaining steps only if it is necessary to
completely test the target DATA-CHL:
1. Determine if errors exist on links using target DATA-CHL
(status link).
2. If there are no errors, busyout the links (busyout link).
3. Determine if no other DATA-CHLs are administered (list
data-module).
4. If no other DATA-CHLs are administered, administer at least
one.
5. Determine if links exist on all non-target DATA-CHLs (status
link).
6. If links exist on all DATA-CHLs, busyout the links (busyout
link).
7. Retry the command at 1-minute intervals, up to 5 times.
8. Restore any busied out links.
1002
ABORT
Error Code 1002 can mean 1 of 2 problems:
a. Could not allocate the necessary system resources to run
this test.
b. Internal system error.
1006
ABORT
Could not allocate the necessary system resources to run this test.
1016
ABORT
Resources for the test are not available.
1. Retry the command at 1-minute intervals, up to 5 times.
1018
ABORT
Test disabled through software patch.
2000
ABORT
Could not allocate the necessary system resources to run this test.
2003
ABORT
Internal system error
1. Retry the command at 1-minute intervals, up to 5 times.
Table 10-182.
TEST #110 Data Channel Crosstalk Test — Continued
Error
Code
Test
Result
Description/Recommendation
Continued on next page
Summary of Contents for Definity SI
Page 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Page 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Page 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Page 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Page 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Page 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...