Maintenance Object Repair Procedures
555-233-123
10-1344
Issue 4 May 2002
4
FAIL
(cont’d.)
3. If the batteries were replaced, it can take up to 24 hours for
the new batteries to be charged (new batteries are shipped
uncharged). If Test #5 is run again before the batteries are
completely charged, the test fails. If the charger was replaced,
some time must be allowed for the new charger to recharge
the batteries. Therefore, in either case, wait at least 24 hours
and rerun the test. If the test still fails, the PR-MAINT
(Maintenance/Tape Processor) in a multicarrier cabinet PPN
system without High or Critical Reliability, the DUPINT
(Duplication) Interface circuit pack in a PPN for a system with
High or Critical Reliability, or the EPN MAINT (Maintenance)
circuit pack in an EPN could be reporting this condition
incorrectly. There are failures that can occur on the
Maintenance/Tape Processor, Duplication Interface, and EPN
Maintenance circuit pack that ARE NOT be detected by the
respective maintenance, but that cause many, if not all,
environment tests to fail. If many environment tests are failing,
the suspect circuit pack, depending on the system
configuration, should be replaced and the test rerun. Resolve
all alarms on these MOs, and rerun the test. If the test still
fails, escalate the problem.
6
FAIL
This indicates that Error Codes 2 and 4 have occurred. Refer to
these descriptions. Also, refer to the description for Error Code 14
for this test.
Table 10-495.
TEST #5 Battery & Battery Charger Query Test — Continued
Error
Code
Test
Result
Description/Recommendation
Continued on next page
Summary of Contents for Definity SI
Page 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Page 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Page 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Page 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Page 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Page 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...