
POWER (Battery & Battery Charger) for AC-Powered
Systems
Issue 4 May 2002
10-1337
555-233-123
POWER (Battery & Battery Charger)
for AC-Powered Systems
Generic 1 and Generic 3iV2 offer two basic cabinet type configurations: (1) the
multicarrier cabinet system and (2) the single-carrier cabinet system. Both cabinet
system configuration may be powered by either an external AC or DC power
source.
NOTE:
For environment maintenance, PPN or EPN cabinet configuration aspects
for a High or Critical Reliability system are irrelevant.
The environment maintenance strategy to be used depends on both the cabinet
configuration and the type of powering. Therefore, refer to the following list to find
the appropriate section(s).
■
For a single-carrier cabinet system, refer to the DC-POWER
(Single-Carrier Cabinet Power) Maintenance documentation for
environment maintenance strategy.
■
For a multicarrier cabinet system using an external AC power source, refer
to one or more of the following Maintenance documentation sections:
AC-POWER (AC Power) for AC-Powered Systems, CARR-POW (Carrier
Port Power Unit) for AC-Powered Systems, or POWER (Battery & Battery
Charger) for AC-Powered Systems.
■
For a multicarrier cabinet system using an external DC power source, refer
to one or more of the following Maintenance documentation sections:
AC-POWER (AC Power) for DC-Powered Systems, CARR-POW (Carrier
Port Power Unit) for DC-Powered Systems, or POWER (Battery & Battery
Charger) for DC-Powered Systems.
The G3iV1.1-286 or G3iV2-386 multicarrier cabinet is equipped with rechargeable
batteries that can span short AC power outages. In a multicarrier PPN system
with High or Critical Reliability, the cabinet can be powered for 10 seconds from
the batteries. After this time, all port carrier power is shed and the control carrier is
powered for another 10 minutes. In a High or Critical Reliability PPN system,
these times are cut to five seconds and five minutes, respectively. In an EPN
multicarrier cabinet, the entire cabinet can be powered for 15 seconds from the
batteries, after which time the entire cabinet is powered down.
MO Name (in
Alarm Log)
Alarm
Level
Initial Command to Run
1
1
Where P is an appropriate port network number determined via the PORT field from the
Alarm or Error Log.
Full Name of MO
POWER
MINOR
test environment P
Battery & Battery Charger
Summary of Contents for Definity SI
Page 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Page 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Page 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Page 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Page 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Page 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...