
ISDN-TRK (DS1 ISDN Trunk)
Issue 4 May 2002
10-995
555-233-123
1113
ABORT
The signaling link has failed, so the system cannot send any
messages on behalf of this trunk.
1. Check the results of Test #255 (Signaling Link State
Check).
1114
ABORT
The signaling link is in a transitional state.
1. Retry the command at 1-minute intervals a maximum of 5
times.
1116
ABORT
The trunk is not in a service state which is appropriate for
running the test. This test is only performed in the OOS/FE
state.
1117
ABORT
A service state audit message is outstanding.
1. Wait two minutes and then try again.
2100
ABORT
Could not allocate the necessary system resources to run this
test.
1. Retry the command at 1-minute intervals a maximum of 5
times.
1113
FAIL
The signaling link has failed, so the system cannot send any
messages on behalf of this trunk.
1. Consult the procedures for ISDN-LNK (ISDN-PRI
Signaling Link Port) and PI-LINK (Processor Interface
Link).
FAIL
Internal system error
1. Retry the command at 1-minute intervals a maximum of 5
times.
PASS
Wait 4 minutes and then check the Error Log for any new
errors of type 3073. If there are none, then both sides of the
ISDN connection agree on the service state; the negotiation
succeeded. If there is a new 3073 error, then the negotiation
failed (the far-end switch twice failed to respond within 2
minutes). The switch will automatically retry every 15 minutes.
If the trunk was initially in-service, it is now placed in the
maintenance/far-end state. Incoming calls will be accepted,
but no outgoing calls can be originated. If an incoming call is
presented, another Service State Audit will be immediately
performed in an attempt to put the DS1 ISDN Trunk in the
proper state.
Table 10-361.
TEST #256 Service State Audit Test — Continued
Error
Code
Test
Result
Description/Recommendation
Continued on next page
Summary of Contents for Definity SI
Page 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Page 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Page 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Page 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Page 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Page 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...