
Maintenance Object Repair Procedures
555-233-123
10-1374
Issue 4 May 2002
1131
ABORT
INADS port is busy because the system is reporting alarms to
INADS, or because INADS is dialed into the system.
1. If INADS is communicating with the switch the INADS trunk is
working. There is no need to run this test.
2. Or if required. Wait about ten minutes (until the INADS
session is terminated) and then re-enter the command.
1000
ABORT
System software resources required to run this test are not
available.
2000
ABORT
MTP did not respond to the test request.
Repeat test at 1-minute intervals a maximum of 5 times.
If only the MTP Analog Loop Around Test is aborting, escalate
the problem.
If all MTP tests are aborting, execute the test processor a/b
long command in order to reset MTP, and examine the results of
the MTP Reset Test (#101).
2033,
2500
ABORT
Internal system error
1. Repeat the command at 1-minute intervals a maximum
of 5 times.
Table 10-508.
TEST #103 MTP Analog Loop Around Test — Continued
Error
Code
Test
Result
Description/Recommendation
Continued on next page
Summary of Contents for Definity SI
Page 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Page 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Page 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Page 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Page 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Page 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...