
Maintenance Object Repair Procedures
555-233-123
10-1670
Issue 4 May 2002
System Technician-Demanded Tests: Descriptions
and Error Codes
When inspecting errors in the system, always investigate tests in the order listed
below. By clearing error codes associated with the Control Channel Loop Around
Test, for example, you may also clear errors generated from other tests in the
testing sequence.
Clear Error Counters Test (#270)
This test is nondestructive.
This test clears the various error counters associated with each TBRI-PT. This test
passes if maintenance software is able to successfully send the downlink
messages; the test aborts otherwise.
Order of Investigation
Short Test
Sequence
Long Test
Sequence
D/ND
1
1
D = Destructive; ND = Nondestructive
BRI Local LAN Port Loop Around Test (#618)
X
D
BRI TDM Port Loop Around Test (#619)
X
D
L1 State Query Test (#1242)
X
X
D
CRC Error Counter Test (#623)
X
ND
Receive FIFO Overflow Test (#625)
X
ND
Layer 3 Query Test (#1243)
X
ND
Slip Query Test (#1244)
X
X
ND
Clear Error Counters Test (#270)
X
X
ND
NPE Crosstalk Test (#617)
X
D
Table 10-612.
TEST #270 Clear Error Counters
Error
Code
Test
Result
Description/Recommendation
Any
ABORT
Maintenance could not send the downlink message.
PASS
The message to clear the error counters of the TBRI-PT
maintenance object has been sent.
Continued on next page
Summary of Contents for Definity SI
Page 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Page 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Page 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Page 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Page 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Page 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...