
Maintenance Object Repair Procedures
555-233-123
10-1324
Issue 4 May 2002
Procedures for Restoring the PMS Link
1. Determine the status of the PMS Link.
Enter status pms command and make sure that the PMS Link is not
busied out for maintenance. If the link is “down,” then continue with the
next step.
2. Where does the PMS Link connect?
Enter display system hospitality and find out the destinations of the PMS
Link.
3. Determine the status of the data extension.
Enter status data <extension> command and verify whether the data
extension is in in-service/idle state. If the data extension is NOT available,
then look for the extension number in Alt Name field of Hardware Error
Log. Refer to the XXX-BD (Common Port Circuit Pack) Maintenance
documentation for resolutions.
4. Is a data channel on Network Control circuit pack in in-service/idle state?
Enter list data command and find out the extension numbers of data
channels on Network Control circuit pack. Enter status data <extension>
command and make sure that at least one data channel is in in-service/idle
state. If no data channel is available, then look for
DATA-CHL/DATA-CON/DATA-BD errors in the Hardware Error Log. If
present, refer to the DATA-BD (Network Control Circuit Pack) Maintenance
documentation; if not present, escalate the error.
5. Is the external PMS device available?
Make sure that the PMS device is ON-LINE and ready for service. Check
the physical connectivity between Data Module and the PMS device.
It is recommended that you busy out the PMS Link before executing maintenance
tests over objects composing the PMS Link. If the PMS Link is busied out, then all
PMS Link maintenance actions are deactivated. The interference to tests of other
MO is off.
Summary of Contents for Definity SI
Page 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Page 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Page 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Page 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Page 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Page 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...