
Maintenance Commands and Trouble-Clearing Aids
555-233-123
8-260
Issue 4 May 2002
release pms-link
The release pms-link command deactivates MOs that are associated with a
property management system link.These links provide asynchronous data
connections from switches to peripherals. They are composed of:
■
Far end data module
■
Simulated data channel on a NETCON board
■
Manager that initiates and maintains the link
■
Controller/protocol that services the link
Feature Interactions
Specific component maintenance performed on a link sometimes conflicts with
link maintenance, itself. (Busied out objects create link setup failure). Frequent
link re-setup attempts may delay faulty component recovery. For best results, use
busyout to disable attempted link re-setup.
Output
The following output example is a display of release pms-link.
Field descriptions
Action/Object
Qualifier
Qualifier Description
Logins
Defaults
Feature
Interactions
release
pms-link
init
inads
craft
none
see below
Port
This field is left blank.
Maintenance Name
PMS-LINK
Alt. Name
Not applicable.
Result
Success status of a busied out object (PASS, ABORT, FAIL)
Error Code
System-generated description of a command failure.
release pms-link
COMMAND RESULTS
Port Maintenance Name Alt. Name Result Error Code
PMS-LINK PASS
Summary of Contents for Definity SI
Page 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Page 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Page 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Page 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Page 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Page 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...