
VC-SUMPT
Issue 4 May 2002
10-1989
555-233-123
VC Summer Port Local TDM Loopback
Test (#1100)
This test is destructive.
This test verifies the connectivity of a VC Summer Port across the TDM bus. It
aborts if calls associated with the port are in progress. Failure of this test indicates
an on-board fault associated with the port hardware on the circuit pack. The
Loopback Test runs the following tests:
■
A Looparound test across the TDM bus.
■
A conference circuit test.
The tests are run in the above order. If the first test fails, the switch returns an
error code, and the second test is not executed.
Table 10-715.
TEST #6 NPE Crosstalk Test
Error
Code
Test
Result
Description/Recommendation
1000
ABORT
System resources required to run this test are not available.
The port may be busy with a valid call.
1. Retry the command at 1-minute intervals a maximum of 5
times.
2012
ABORT
Internal system error
2100
ABORT
Could not allocate the necessary resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5
times.
FAIL
The NPE of the tested port was transmitting in error, causing
noisy and unreliable connections.
1. Replace the circuit pack.
PASS
The port is correctly using its allocated time slots.
1. To be sure that this is not an intermittent problem, repeat
this test a maximum of 10 times.
2. If complaints still persist, examine the station,
connections, and wiring.
Continued on next page
Summary of Contents for Definity SI
Page 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Page 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Page 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Page 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Page 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Page 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...