
SW-CTL (Switch Control)
Issue 4 May 2002
10-1583
555-233-123
2012
32413
32416
32423
32425
ABORT
Internal system error
2013
32411
32421
ABORT
Could not allocate the necessary system resources to run
test.
1. Retry the command at 1-minute intervals a maximum of 5
times.
32414
32417
32424
32427
ABORT
The messages failed to return (timed out) and were not
verified.
1. Retry the command at 1-minute intervals a maximum of
five retries.
2. If the test continues to abort and SW-CTL Test #325
passes, there is not a problem, but if SW-CTL Test #325
fails, follow the recommendations for SW-CTL Test #325.
1029
2014
2015
2016
2017
2018
2020
2022
2024
2025
2051
ABORT
Refer to STBY-SPE for a description of these error codes.
Table 10-586.
TEST #324 Switch Control EPN Maintenance Board Interface Test
— Continued
Error
Code
Test
Result
Description/Recommendation
Continued on next page
Summary of Contents for Definity SI
Page 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Page 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Page 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Page 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Page 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Page 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...