
AN-LN-PT (Analog Line Port)
Issue 4 May 2002
10-119
555-233-123
2000
ABORT
Response to the test request was not received within the
allowable time period.
2100
ABORT
System resources required to run this test are not available.
1. Resolve any TONE-PT errors in the error log.
2. If there are no TONE-PT errors, retry the command at
1-minute intervals no more than 5 times.
3. If the test continues to abort, escalate the problem.
Any
FAIL
The NPE of the tested port did not conference the tones
correctly. This causes noisy and unreliable connections.
1. Issue the display port UUCSSpp and the status station
extension commands to determine if the station is idle.
2. If the station is idle, issue the test port UUCSSpp
command for this port.
3. If the test continues to fail, issue the busy port UUCSSpp
and the release port UUCSSpp commands, and then
retest.
4. If the test still fails, replace the board.
PASS
The port can correctly conference multiple connections.
Investigate user-reported troubles on this port by running other
port tests; by examining station, trunk, or external wiring; or by
inspecting the station.
0
NO
BOARD
The test could not relate the internal ID to the port (no board).
This result could be due to incorrect translations, no board is
inserted, an incorrect board is inserted, or an insane board is
inserted.
1. Check to make sure that the board translations are
correct. Use the list configuration command, and
resolve any problems.
2. If the board is correctly inserted, issue the busy board
UUCSS command.
3. Issue the reset board UUCSS command.
4. Issue the release board UUCSS command.
5. Issue the test board UUCSS long command. This
re-establishes the link between the internal ID and the
port.
6. If this is not the case, check to make sure that a valid
board is inserted.
Table 10-39. TEST #7 Conference Circuit Test — Continued
Error
Code
Test
Result
Description/Recommendation
Continued on next page
Summary of Contents for Definity SI
Page 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Page 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Page 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Page 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Page 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Page 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...