
Maintenance Object Repair Procedures
555-233-123
10-1496
Issue 4 May 2002
Error Log Entries and Test to Clear Values
System Technician-Demanded Tests: Descriptions
and Error Codes
Always investigate tests in the order presented in the table below. By clearing
error codes associated with the Shadow Link Test, for example, you may also
clear errors generated from other tests in the testing sequence.
The Short and Long Test Sequences for Memory Shadowing Link are identical.
Only one test (Test #318) tests the Memory Shadowing Link.
Table 10-571.
Standby SPE Error Log Entries
Error
Type
Aux
Data
Associated Test
Alarm
Level
On/Off
Board
Test to Clear Value
0
1
1
Run the Short Test Sequence first. If all tests pass, run the Long Test Sequence. Refer to the
appropriate test description and follow the recommended procedures.
0
Any
Any
Any
test shadow-link
2047
Shadow Link Test (#318)
MAJOR
OFF
test shadow-link
2048
Shadow Link Test (#318)
MAJOR
OFF
test shadow-link
2049
Shadow Link Test (#318)
MAJOR
OFF
test shadow-link
2050
Shadow Link Test (#318)
MAJOR
OFF
test shadow-link
Order of Investigation
Short Test
Sequence
Long Test
Sequence
D/ND
1
1
D = Destructive; ND = Nondestructive
Shadow Link Test (#318)
X
X
ND
Summary of Contents for Definity SI
Page 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Page 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Page 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Page 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Page 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Page 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...