
Maintenance Object Repair Procedures
555-233-123
10-1414
Issue 4 May 2002
Link Tear Down Test (#213)
This test is destructive.
This test disconnects the existing link between the system and the external CDR
output device. If the link has been disconnected already, this test just returns
PASS. All resources allocated for an CDR link are released after this test.
Table 10-529.
TEST #213 Link Tear Down Test
Error
Code
Test
Result
Description/Recommendation
40
ABORT
Internal system error
50
ABORT
Internal system error
1. Retry the command at 1-minute intervals a maximum of 5
times.
1010
ABORT
The CDR link has been busied out to out-of-service.
1. Enter the release cdr-link primary|secondary command to
release the CDR link from busyout state.
2. Retry the test cdr-link primary|secondary long command to
execute the test.
FAIL
Internal system error
1. Retry the command at 1-minute intervals a maximum of 5
times.
PASS
The CDR link is torn down.
Continued on next page
Summary of Contents for Definity SI
Page 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Page 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Page 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Page 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Page 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Page 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...