
Install DS1 CPE Loopback Jack (T1 Only)
Issue 4 May 2002
5-67
555-233-123
Configurations Without a Smart Jack
When the loopback jack is added to a span that does not contain a Smart Jack,
the span is divided into 2 sections. See
1. ICSU to the loopback jack.
2. Loopback jack to the Central Office (CO).
Figure 5-14.
Network Interface at “Dumb” Block
Figure Notes:
1. Span Section 1
2. Span Section 2
3. 120A2 (or later) Integrated
Channel Service Unit
(ICSU)
4. RJ-48 to Network Interface
(Up to 1000 Feet) (305 m)
5. Loopback Jack
6. “Dumb” Block (Demarcation Point)
7. Interface Termination or Fiber MUX
8. Central Office
Summary of Contents for Definity SI
Page 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Page 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Page 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Page 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Page 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Page 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...