
PPP-PT (Control LAN Packet/Port)
Issue 4 May 2002
10-1365
555-233-123
FAIL
PPP link is down.
1. Test the port (test port UUCSSpp long) to verify the
SCOTCH Synchronous Local Loop Around Test (#1275)
result.
2. If the test passes, wait for sessions to come up.
3. If the test fails, check the destination and other components
in the path (e.g., DS1 trunks).
4. If the destination and other components in the path are
in-service and the test still fails, execute busyout port
UUCSSpp and release port UCCSSpp, and repeat the
test.
5. If the test still fails, reset the circuit pack (busyout board
UUCSS, reset board UUCSS, and release board
UUCSS). Repeat the test.
6. If the problem persists, replace the circuit pack.
PASS
PPP link is up.
Table 10-504.
TEST #1279 PPP Link Status Inquiry Test — Continued
Error
Code
Test
Result
Description/Recommendation
Continued on next page
Summary of Contents for Definity SI
Page 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Page 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Page 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Page 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Page 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Page 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...