
DID-DS1 (DS1 DID Trunk)
Issue 5 October 2002
989
555-233-119
NPE Crosstalk Test (#6)
One or more NPEs reside on each circuit pack with a TDM Bus interface. The
NPE controls port connectivity and gain, and provides conferencing functions on a
per-port basis. The NPE Crosstalk Test verifies that this port’s NPE channel talks
on the selected time slot and never crosses over to time slots reserved for other
connections. If the NPE is not working correctly, one-way and noisy connections
may be observed. This test is usually only part of a port’s Long Test Sequence
and takes about 20 to 30 seconds to complete.
Table 185.
TEST #6 NPE Crosstalk Test
Error
Code
Test
Result
Description/ Recommendation
ABORT
System resources required for this test are not available.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1000
ABORT
System resources required to run this test were not available.
The port may be busy with a valid call. Use the display port PCSSpp
command to determine the trunk group/member number of the port. Use
the status trunk command to determine the service state of the port. If the
service state indicates that the port is in use, then the port is unavailable for
certain tests. You must wait until the port is idle before retesting.
1. If the port status is active but the port is not in use (no calls), check the
error log for error type 1025 (see the Error Log table for a description of
this error and required actions). The port may be locked up.
2. If the port status is idle, retry the command at 1 minute intervals for a
maximum of 5 times.
1001
ABORT
System resources required for this test are not available.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1002
ABORT
The system could not allocate time slots for the test. The system may be
under heavy traffic conditions or it may have time slots out-of-service due
to TDM BUS error. Refer to TDM-BUS (TDM Bus) Maintenance
documentation to diagnose any active TDM Bus errors.
1. If system has no TDM-BUS errors and is not handling heavy traffic,
repeat test at 1-minute intervals a maximum of 5 times.
Continued on next page
Содержание DEFINITY Server CSI
Страница 1: ...Maintenance for Avaya DEFINITY Server CSI Volumes 1 and 2 Release 1 2 555 233 119 Issue 5 October 2002...
Страница 6: ......
Страница 20: ...Contents 555 233 119 20 Issue 5 October 2002...
Страница 30: ...About this Book 555 233 119 30 Issue 5 October 2002...
Страница 944: ...Maintenance Objects 555 233 119 944 Issue 5 October 2002...
Страница 1397: ...MMI BD Issue 5 October 2002 1397 555 233 119 Figure 44 TN787 Multimedia Interface MMI Circuit Pack...
Страница 1409: ...MMI PT Issue 5 October 2002 1409 555 233 119 Figure 45 TN787 Multimedia Interface MMI Circuit Pack...
Страница 1891: ...VC DSPPT Issue 5 October 2002 1891 555 233 119 Figure 63 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 1902: ...Maintenance Objects 1902 Issue 5 October 2002 Figure 65 VC Circuit Pack Summer Port Loopback Test...