
PR-MAINT (Maintenance Processor)
Issue 5 October 2002
1521
555-233-119
FAIL
The Manager I channel failed the Loop Back Test. The Manager I is
probably unusable for administration or maintenance. The EPN
Manager I, if available, or remote access can still be used.
1. Repeat the command at one minute intervals a maximum of 5
times.
2. If the test continues to fail, replace the Processor circuit pack at
your earliest convenience. Refer to Chapter 1 “Reliability
Systems: A Maintenance Aid” for information on how to replace a
circuit pack in the control carrier.
!
WARNING:
If the TN786B circuit pack must be replaced, and if there is a
blank in the Expansion Memory circuit pack slot (that is, in the
slot immediately to the right of the TN786B circuit pack), remove
the blank before removing the circuit pack. Otherwise, the circuit
pack and/or the two connectors that are used to connect the
Expansion Memory circuit pack (if available) might become
damaged.
PASS
The Manager I channel passed the Loop Back Test.
1. If the PPN Manager I is not usable, check the Manager I itself,
along with the cabling.
Table 415.
TEST #228 MTP Manager I Loop Around Test —
Continued
Error
Code
Test
Result
Description/Recommendation
Continued on next page
Содержание DEFINITY Server CSI
Страница 1: ...Maintenance for Avaya DEFINITY Server CSI Volumes 1 and 2 Release 1 2 555 233 119 Issue 5 October 2002...
Страница 6: ......
Страница 20: ...Contents 555 233 119 20 Issue 5 October 2002...
Страница 30: ...About this Book 555 233 119 30 Issue 5 October 2002...
Страница 944: ...Maintenance Objects 555 233 119 944 Issue 5 October 2002...
Страница 1397: ...MMI BD Issue 5 October 2002 1397 555 233 119 Figure 44 TN787 Multimedia Interface MMI Circuit Pack...
Страница 1409: ...MMI PT Issue 5 October 2002 1409 555 233 119 Figure 45 TN787 Multimedia Interface MMI Circuit Pack...
Страница 1891: ...VC DSPPT Issue 5 October 2002 1891 555 233 119 Figure 63 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 1902: ...Maintenance Objects 1902 Issue 5 October 2002 Figure 65 VC Circuit Pack Summer Port Loopback Test...