
HYB-LINE (Hybrid Line)
Issue 5 October 2002
1255
555-233-119
Hybrid Line Audits Test (#61)
This is a series of three tests that are classified as audits. These audits abort if
attempted on an out-of-service station. The tests are as follows:
■
Switchhook Audit - This is an update of the SPE records according to the
circuit packs’ records.
■
Bad Scan Inquiry - A message is sent uplink that contains a count that is
generated due to certain events relating to the data link conditions. This is
an indication of data transmission problems between the Hybrid circuit
pack and the voice terminal.
■
EPF Inquiry - The status of the Electronic Power Feed is sent uplink.
Possible conditions are: EPF-on-ok, EPF-off, EPF-no-load, and
EPF-on-overcurrent.
Table 294.
TEST #61 Hybrid Line Audits Test
Error
Code
Test
Result
Description/ Recommendation
ABORT
Internal System Error
1
ABORT
The test was aborted due to an internal system error during the switchhook
audit.
2
ABORT
Internal System Error occurred during bad scan inquiry audit.
1. Make sure that the station is not in an out of service state.
2. Retry the command at 1-minute intervals a maximum of 5 times.
3
ABORT
This port may have been busied out by system technician.
1. Look in the Error Log for Error Type 18 (port busied out) for this port. If
this error type is present, the release the port via the release station
<extension> command and run the test again.
2. Make sure that the terminal is connected.
3. Retry the command at 1-minute intervals a maximum of 5 times.
1000
ABORT
System resources required to run this test are not available. The port may
be busy with a valid call. Use the display port PCSSpp to determine the
station extension number of the port. Use the status station command to
determine the service state of the port. If the service state indicates that the
port is in use, then the port is unavailable for certain tests. You must wait
until the port is idle before retesting. Attendants are always in use
(off-hook), if the handset is plugged in and the port is not busied out.
1. If the port status is idle, then retry the command at 1-minute intervals a
maximum of 5 times.
Continued on next page
Содержание DEFINITY Server CSI
Страница 1: ...Maintenance for Avaya DEFINITY Server CSI Volumes 1 and 2 Release 1 2 555 233 119 Issue 5 October 2002...
Страница 6: ......
Страница 20: ...Contents 555 233 119 20 Issue 5 October 2002...
Страница 30: ...About this Book 555 233 119 30 Issue 5 October 2002...
Страница 944: ...Maintenance Objects 555 233 119 944 Issue 5 October 2002...
Страница 1397: ...MMI BD Issue 5 October 2002 1397 555 233 119 Figure 44 TN787 Multimedia Interface MMI Circuit Pack...
Страница 1409: ...MMI PT Issue 5 October 2002 1409 555 233 119 Figure 45 TN787 Multimedia Interface MMI Circuit Pack...
Страница 1891: ...VC DSPPT Issue 5 October 2002 1891 555 233 119 Figure 63 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 1902: ...Maintenance Objects 1902 Issue 5 October 2002 Figure 65 VC Circuit Pack Summer Port Loopback Test...