555-233-119
1302
Issue 5 October 2002
1
FAIL
Layer 2 of the primary signaling channel is down:
1. Examine the results of the Primary Signaling Link Hardware Test (#636)
and follow recommendations provided there.
2. If test #636 passes, the Layer 2 Query test may still fail if the Signaling
Channel at the far end has not been administered correctly or if it has
been busied out. Verify that the Primary Signaling Channel (D-channel)
at the far end has been administered correctly. Verify that the DS1 port
used for the Primary D-channel has not been busied out at the far end.
2
FAIL
Layer 2 of the secondary signaling channel is down.
1. Examine the results of Secondary Signaling Link Hardware Test (#639)
and follow recommendations provided there.
2. If tests #639 passes, the Layer 2 Query test may still fail if the Signaling
Channel at the far end has not been administered correctly or if the
Signaling Channel has been busied out. Verify that the Secondary
Signaling Channel (D-channel) at the far end has been administered
correctly. Verify that the DS1 port used for the Secondary D-channel
has not been busied out at the far end.
3
FAIL
Both the primary and secondary Channels are down.
1. Examine the results of the Primary and Secondary Signaling Link
Hardware Tests (#636 and #639) and follow recommendations provided
there.
2. If tests #636 and #639 pass, the Layer 2 Query test may still fail if the
Signaling Channels at the far end has not been administered correctly
or if the Signaling Channels have been busied out. Verify that the
Primary and Secondary Signaling Channel (D-channels) at the far end
have been administered correctly. Verify that the DS1 ports used for the
Primary and Secondary D-channels have not been busied out at the far
end.
PASS
The Primary Signaling Channel is up and, if administered the Secondary
Channel is up.
Table 314.
TEST #647 Layer 2 Status Query Test — Continued
Error
Code
Test
Result
Description/ Recommendation
Continued on next page
Содержание DEFINITY Server CSI
Страница 1: ...Maintenance for Avaya DEFINITY Server CSI Volumes 1 and 2 Release 1 2 555 233 119 Issue 5 October 2002...
Страница 6: ......
Страница 20: ...Contents 555 233 119 20 Issue 5 October 2002...
Страница 30: ...About this Book 555 233 119 30 Issue 5 October 2002...
Страница 944: ...Maintenance Objects 555 233 119 944 Issue 5 October 2002...
Страница 1397: ...MMI BD Issue 5 October 2002 1397 555 233 119 Figure 44 TN787 Multimedia Interface MMI Circuit Pack...
Страница 1409: ...MMI PT Issue 5 October 2002 1409 555 233 119 Figure 45 TN787 Multimedia Interface MMI Circuit Pack...
Страница 1891: ...VC DSPPT Issue 5 October 2002 1891 555 233 119 Figure 63 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 1902: ...Maintenance Objects 1902 Issue 5 October 2002 Figure 65 VC Circuit Pack Summer Port Loopback Test...