
BRI-SET, ASAI-ADJ, BRI-DAT
Issue 5 October 2002
833
555-233-119
BRI Remote Loop Back Test (#627)
This test checks the integrity of a circuit switched B-channel connection between
the switch and the endpoint.
In this test, the endpoint is put in the “maintenance busy” state to prevent the
switch from issuing calls to the endpoint during the test. An application message
containing a loop back activate request for the appropriate B-channel is sent to
the endpoint. The endpoint responds with a loop back activated response.
Maintenance sends data to the endpoint over the B-channel under test. Since the
B-channel is looped back at the endpoint, maintenance should receive the data
that it sent. If no data is detected, the test fails. An application message containing
a loop back deactivate request is sent to the endpoint to terminate the remote loop
back test. The endpoint responds with an MIM message containing a loop back
deactivate response. Maintenance releases the endpoint so that it is available to
terminate calls.
This test is not used for ASAI adjuncts. Adjuncts do not support MIMs upon which
this test is based.
1113
FAIL
The signaling link is not "bound" to the adjunct or endpoint. For BRI
endpoints supporting MIM initialization, this error indicates that the
endpoint has not been bound to a signaling link (that is, SPID initialization
has not been completed). Since the signaling link associated with the
endpoint is not identified until SPID initialization completes, this error does
not imply that the signaling link is connected or disconnected at Layer 2 nor
does it provide the status of TEI assignment for the endpoint. For ASAI
adjuncts and BRI endpoints not supporting MIM initialization, this error
indicates that the link is disconnected at Layer 2. Since the signaling link
associated with the endpoint has been identified via administration, the link
is only "unbound" from the endpoint when it is disconnected.
1. Use status bri-port PCSSpp and refer to the associated procedures
for this command contained in the BRI-PORT (ISDN-BRI Port)
Maintenance documentation.
PASS
The signaling link is connected at Layer 2 and "bound" to the BRI endpoint
or ASAI adjunct.
Table 125.
TEST #626 Signaling Link Status Test —
Continued
Error
Code
Test
Result
Description/ Recommendation
Continued on next page
Содержание DEFINITY Server CSI
Страница 1: ...Maintenance for Avaya DEFINITY Server CSI Volumes 1 and 2 Release 1 2 555 233 119 Issue 5 October 2002...
Страница 6: ......
Страница 20: ...Contents 555 233 119 20 Issue 5 October 2002...
Страница 30: ...About this Book 555 233 119 30 Issue 5 October 2002...
Страница 944: ...Maintenance Objects 555 233 119 944 Issue 5 October 2002...
Страница 1397: ...MMI BD Issue 5 October 2002 1397 555 233 119 Figure 44 TN787 Multimedia Interface MMI Circuit Pack...
Страница 1409: ...MMI PT Issue 5 October 2002 1409 555 233 119 Figure 45 TN787 Multimedia Interface MMI Circuit Pack...
Страница 1891: ...VC DSPPT Issue 5 October 2002 1891 555 233 119 Figure 63 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 1902: ...Maintenance Objects 1902 Issue 5 October 2002 Figure 65 VC Circuit Pack Summer Port Loopback Test...