
555-233-119
1322
Issue 5 October 2002
1114
ABORT
The signaling link is in a transitional state.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1116
ABORT
The trunk is not in a service state which is appropriate for running the test.
This test is only performed in the OOS/FE state.
1117
ABORT
A service state audit message is outstanding.
1. Wait two minutes and then try again.
2100
ABORT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1113
FAIL
The signaling link has failed, so the system cannot send any messages on
behalf of this trunk.
1. Consult the procedures for ISDN-LNK (ISDN-PRI Signaling Link Port)
and PKT-INT (Packet Interface).
FAIL
Internal system error
1. Retry the command at 1-minute intervals a maximum of 5 times.
PASS
Wait 4 minutes and then check the Error Log for any new errors of type
3073. If there are none, then both sides of the ISDN connection agree on
the service state; the negotiation succeeded. If there is a new 3073 error,
then the negotiation failed (the far-end switch twice failed to respond within
2 minutes). The switch will automatically retry every 15 minutes. If the trunk
was initially in-service, it is now placed in the maintenance/far-end state.
Incoming calls will be accepted, but no outgoing calls can be originated. If
an incoming call is presented, another Service State Audit will be
immediately performed in an attempt to put the DS1 ISDN Trunk in the
proper state.
Table 322.
TEST #256 Service State Audit Test — Continued
Error
Code
Test
Result
Description/ Recommendation
Continued on next page
Содержание DEFINITY Server CSI
Страница 1: ...Maintenance for Avaya DEFINITY Server CSI Volumes 1 and 2 Release 1 2 555 233 119 Issue 5 October 2002...
Страница 6: ......
Страница 20: ...Contents 555 233 119 20 Issue 5 October 2002...
Страница 30: ...About this Book 555 233 119 30 Issue 5 October 2002...
Страница 944: ...Maintenance Objects 555 233 119 944 Issue 5 October 2002...
Страница 1397: ...MMI BD Issue 5 October 2002 1397 555 233 119 Figure 44 TN787 Multimedia Interface MMI Circuit Pack...
Страница 1409: ...MMI PT Issue 5 October 2002 1409 555 233 119 Figure 45 TN787 Multimedia Interface MMI Circuit Pack...
Страница 1891: ...VC DSPPT Issue 5 October 2002 1891 555 233 119 Figure 63 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 1902: ...Maintenance Objects 1902 Issue 5 October 2002 Figure 65 VC Circuit Pack Summer Port Loopback Test...