
Maintenance Commands
555-233-119
560
Issue 5 October 2002
Once the call is answered by INADS, the system sends a message with a test
alarm type. INADS acknowledges receipt of the message and creates a trouble
ticket. The trouble ticket is closed immediately and has a “INADS LINK TEST”
message entered in the description field. If an alarm is raised while the test call is
up, the system does not send an alarm message over the existing link. The
normal retry mechanism is followed, which means an attempt to make a call to
INADS to report the error takes place 7 minutes later. An INADS trouble ticket is
created only if the connection is successfully established and a message is sent
to the system acknowledging that INADS received the system message.
The
Maintain Process Circuit Packs
field must be set to yes on the inads
and technician permission forms. This will provide permissions to execute test
inads-link. Use change permission login to change the field.
No alarms are raised on the system and attendant alarm and acknowledgment
lamp states are not changed as a result of test inads-link. The test does not run
during periodic or scheduled maintenance.
Output
Action/Object
Qualifier
Qualifier Description
Logins
Defaults
Feature Interactions
test inads-link
1
2
First OSS telephone number
Second OSS telephone number
Examples:
test inads-link
test inads-link 1
test inads-link 2
init
inads
craft
nms
1st OSS
number
none
Command successfully
completed
Test passed
Command failed
Link was up, there was an active alarm that the switch needs to
report, or there was a problem with the call.
An entry is made in the error log describing why the inads-link
test failed.
Содержание DEFINITY Server CSI
Страница 1: ...Maintenance for Avaya DEFINITY Server CSI Volumes 1 and 2 Release 1 2 555 233 119 Issue 5 October 2002...
Страница 6: ......
Страница 20: ...Contents 555 233 119 20 Issue 5 October 2002...
Страница 30: ...About this Book 555 233 119 30 Issue 5 October 2002...
Страница 944: ...Maintenance Objects 555 233 119 944 Issue 5 October 2002...
Страница 1397: ...MMI BD Issue 5 October 2002 1397 555 233 119 Figure 44 TN787 Multimedia Interface MMI Circuit Pack...
Страница 1409: ...MMI PT Issue 5 October 2002 1409 555 233 119 Figure 45 TN787 Multimedia Interface MMI Circuit Pack...
Страница 1891: ...VC DSPPT Issue 5 October 2002 1891 555 233 119 Figure 63 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 1902: ...Maintenance Objects 1902 Issue 5 October 2002 Figure 65 VC Circuit Pack Summer Port Loopback Test...