Error Code Manual Chapter2. Bill Recycling Machine (BRM)
2-52
© 2014
Nautilus Hyosung Inc.
All Rights Reserved.
Code
Problem Description
Troubleshooting
526P300
PP lose return position
movement error during Deposit
Count.
1. Open the upper unit
2. Check the notes and substance
inside of the CSM
3. Check PP rotates softly using knob of
the CSM(1)
526P400
PP lose return position
movement error during Deposit
Count.
1. Open the upper unit
2. Check the notes and substance
inside of the CSM
3. Check knob rotates softly in the
CSM(1)
526P500
PP notes out error during
Deposit Count.
1. Open the upper unit
2. Check the notes and substance
inside of the CSM
3. Check PP rotates softly using knob of
the CSM(1)
526P600
PP notes alignment error
during Deposit Count.
1. Open the upper unit
2. Check the notes and substance
inside of the CSM
3. Check PP rotates softly using knob of
the CSM(1)
526P700
PP separate control(during
separating) error during
Deposit Count.
1. Open the upper unit
2. Check the notes and substance
inside of the CSM
3. Check PP rotates softly using knob of
the CSM(1)
526P800
PP stack control(during
stacking) error during Deposit
Count.
1. Open the upper unit
2. Check the notes and substance
inside of the CSM
3. Check PP rotates softly using knob of
the CSM(1)
526P900
Error of reverting notes during
Deposit Count.
1. Open the upper unit
2. Check the notes and substance in the
CSM(2)
3. Check the knob rotates softly in the
CSM(2)
4. Check the knob rotates softly in the
CSM(3)
526PA00
PP ready stop error during
Deposit Count.
1. Operate to initialize BRM(Recovery)
526R100
CSM message timeout error
during operation ready in the
Deposit Count.
1. Operate to initialize BRM(Recovery)
2. Reboot the system when same error
occurred (message timeout error) after
initialization
526R200
CSM message timeout error
during transaction operation in
the Deoist Count.
1. Operate to initialize BRM(Recovery)
2. Reboot the system when same error
occurred (message timeout error) after
initialization
526R300
CSM message timeout error
during postprocessing of
Deposit Count Error.
1. Operate to initialize BRM(Recovery)
2. Reboot the system when same error
occurred (message timeout error) after
initialization
5271300
GS703 dark jam during
Deposit Count.
1. Open the upper unit
2. Open the TE(Temporary Escrow) (12)
3. Rotate a knob of TE(12)
4. Remove notes and substance in the
Rear Transport Path(11)