Error Code Manual Chapter2. Bill Recycling Machine (BRM)
2-286
© 2014
Nautilus Hyosung Inc.
All Rights Reserved.
Code
Problem Description
Troubleshooting
59AA600
Status of CSM open before the
operation during Customer
Change.
1. Open the upper Unit
2. Check open/close of CSM
3. Check sensor GS011
59AA700
Status of RJC removal before
the operation during Customer
Change.
1. Open the lower unit
2. Open the Mid Transport Path
3. Check the reject CST(21)
Load/Removal
59AA800
Status of BMD inter lock
detachment before the
operation during Customer
Change.
1. Check the lower Unit load/removal
2. Check the lower unit status of inter
lock
3. Exchange the cherry switch or clean
the inter lock sensor(or exchange) if
occur same error
59AA900
Status of BMD removal before
the operation during Customer
Change.
1. Check the lower Unit load/removal
2. Check the lower unit status of inter
lock
3. Exchange the cherry switch or clean
the inter lock sensor(or exchange) if
occur same error
59AAA00
Status of BC open before the
operation during Customer
Change.
1. Open the upper unit
2. Check the lock lever in the BC
59AAB00
Status of RC full before the
operation during Customer
Change.
1. Open the lower unit
2. Open the Mid Transport Path
3. Check the GSx11 full detection
sensor of recycle cassettes(A~E)
4. Open the cassette door
5. Check the notes full in the cassette
59AAC00
Status of RJC full before the
operation during Customer
Change.
1. Open the lower unit
2. Open the Mid Transport Path
3. Remove reject cassette(21)
4. Remove notes after checking notes
full in the cassette
5. Check whether the sensor is
contaminated or not if a cassette is
empty.
59AE100
Received operation command
during Customer Change.
1. Restart over AP-SP
2. Do transation operation follow by set
up read system Info for TM Test-> Initail
Info Set -> Initialization
59AE200
Status on not operation
receiption command during
Customer Change.
1. Restart over AP-SP
2. Do transation operation follow by set
up read system Info for TM Test-> Initail
Info Set -> Initialization
59AE300
Received operation command
without Sysrem Info Read
during Customer Change.
1. Restart over AP-SP
2. Do transation operation follow by set
up read system Info for TM Test-> Initail
Info Set -> Initialization
59AE400
Customer Change Repair
transaction was executed
without Initializing after power
on.
1. Restart over AP-SP
2. Do transation operation follow by set
up read system Info for TM Test-> Initail
Info Set -> Initialization
59AE600
Error to received Customer
Change during TE Button
Operating.
1. Operate to initialize BRM(Recovery)
2. Reboot the system when same error
occurred (message timeout error) after
initialization