
Error Code Manual Chapter2. Bill Recycling Machine (BRM)
2-526
© 2014
Nautilus Hyosung Inc.
All Rights Reserved.
Code
Problem Description
Troubleshooting
5T6G300
BP separate position transfer
error during Module Test.
1. Open the upper unit
2. Open the CSM(1) shetter
3. Check the notes and substance
inside of the CSM
5T6G400
BP separate control error
during Module Test.
1. Open the upper unit
2. Open the CSM(1) shetter
3. Check the notes and substance
inside of the CSM
5T6G500
BP notes out position error
during Module Test.
1. Open the upper unit
2. Open the CSM(1) shetter
3. Check the notes and substance
inside of the CSM
5T6G900
Separate stop failure error
during Module Test.
1. Open the upper unit
2. Check the notes and substance in the
CSM(2)
3. Check the knob rotates softly in the
CSM(2)
4. Check the GS660 sensor status
5T6GA00
Failure to move
withdrawal(stack) position of
stack roller(GM605 disorder)
during Module Test.
1. Open the upper unit
2. Check the knob rotates softly in the
CSM(3)
5T6GB00
Stack roller deposit position
transferfailure stack
roller(GM605 disorder) during
Module Test.
1. Open the upper unit
2. Check the knob rotates softly in the
CSM(3)
5T6GC00
Failure to control stack
roller(GM605 disorder) during
Module Test.
1. Open the upper unit
2. Check the knob rotates softly in the
CSM(3)
5T6GD00
Failure to Lift-up during Module
Test.
1. Open the upper unit.
2. Open the customer service module
(CSM) shutter(1)
3.Check the notes and substance inside
of the CSM
5T6GE00
Failure to Lift-down during
Module Test.
1. Open the upper unit.
2. Open the customer service module
(CSM) shutter(1)
3.Check the notes and substance inside
of the CSM
5T6GF00
Failure to move gate roller to
home position during Module
Test.
1. Open the upper unit.
2. Check the knob rotates softly in the
CSM(2)
5T6P100
PP withdrawal(stack) position
transfer error during Module
Test.
1. Open the upper unit
2. Check the notes and substance
inside of the CSM
3. Check PP rotates softly using knob of
the CSM(1)
5T6P200
PP deposit position transfer
error during Module Test.
1. Open the upper unit
2. Check the notes and substance
inside of the CSM
3. Check PP rotates softly using knob of
the CSM(1)