![background image](http://html.mh-extra.com/html/xerox/workcentre-5335-series/workcentre-5335-series_service-manual_884308052.webp)
BUS Updated 12/2011
07/2011
2-36
WorkCentre 5335 Family Service Documentation
003-343, 003-344
Initial Issue
Status Indicator RAPs
003-343 IISS-ESS Communication 24 RAP
BSD-ON:
BSD 3.3 - ESS-IIT Communication
BSD-ON:
BSD 16.1 - ESS
A parameter synchronization error during receiving occurred.
Procedure
•
Ensure that the customer is programming a job within the parameters of the machine uti-
lizing the UI.
•
Disconnect then reconnect the IIT, Control Panel, ESS, MCU all PWBs connected to them
(RAM, Firmware module, EEPROM)
•
Reload Software (
GP 16
)
•
Replace IIT PWB (Switch the EEPROM) (
PL 1.6
)
•
If the problem persists, replace the ESS PWB (
PL 35.2
). (If not fixed by this, reinstall the
original ESS PWB and RAM DIMM.)
003-344 IISS_ESS X Hotline Power On RAP
BSD-ON:
BSD 3.3 - ESS-IIT Communication
BSD-ON:
BSD 16.1 - ESS
There is a communication failure at power on between the controller and the IIT.
Initial Actions
Power On/Off
Procedure
•
Ensure that the customer is programming a job within the parameters of the machine uti-
lizing the UI.
•
Disconnect then reconnect the IIT, Control Panel, ESS, MCU all PWBs connected to them
(RAM, Firmware module, EEPROM)
•
Reload Software (
GP 16
)
•
Replace IIT PWB (Switch the EEPROM) (
PL 1.6
)
•
If the problem persists, replace the ESS PWB (
PL 35.2
). (If not fixed by this, reinstall the
original ESS PWB and RAM DIMM.)