BUS Updated 12/2011
07/2011
2-1034
WorkCentre 5335 Family Service Documentation
OF 99-8
Initial Issue
Status Indicator RAPs
OF 99-8 Set Gate Solenoid Open
Procedure
NOTE: To view the Circuit Diagram for this procedure refer to (
Figure 1
).
There is +24VDC measured between the Nip/Release Solenoid Pin 1 (+) and GND (-).
Y
N
There is +24VDC measured between the PWB Pin 5 (+) and GND(-).
Y
N
Check +24VDC inputs on the PWB. If the check is OK, replace the PWB.
Check the wire between the PWB Pin 5 and the Nip/Release Solenoid Pin 1 for an open
circuit or poor contact.
Enter
Component Control
[XXX-XXX]. There is +24VDC measured between the PWB Pin 4
(+) and GND(-).
Y
N
There is +24VDC measured between the Nip/Release Solenoid Pin 3 (+) and GND (-
).
Y
N
Replace the Nip/Release Solenoid.
Check the wire between the PWB Pin 4 and the Nip/Release Solenoid Pin 3 for an open
circuit and poor contact.
Follow the following when the release caused a problem.
Go to the
Component Control
[XXX-XXX]. There is +24VDC measured between the PWB
Pin 6 (+) and GND(-).
Y
N
There is +24VDC measured between the Nip/Release Solenoid Pin 2 (+) and GND (-)
Y
N
Replace the Nip/Release Solenoid.
Check the wire between the PWB Pin 6 and the Nip/Release Solenoid Pin 2 for an open
circuit or poor contact.
Replace the PWB.
Figure 1 Nip Solenoid CD