![background image](http://html.mh-extra.com/html/xerox/workcentre-5335-series/workcentre-5335-series_service-manual_8843081120.webp)
BUS Updated 12/2011
07/2011
4-59
WorkCentre 5335 Family Service Documentation
REP 7.4
Repairs & Adjustments
Initial Issue
6.
Remove the E-Ring (
Figure 4
).
Figure 4 E-Ring Removal
7.
Release the Cables from the Shaft (
Figure 5
):
a.
Slide the Pulley.
b.
Release the Cables from the Shaft detente.
Figure 5 Cable Release
8.
Remove the Guide (
Figure 6
):
a.
Remove the Screw (1).
b.
Remove the Guide.
Figure 6 Guide Removal
9.
Remove the Cables (
Figure 7
):
a.
Remove the Pulleys (2).
b.
Raise the Plate and remove the Cables through the plate holes.
Figure 7 Cable Removal
Replacement
NOTE: Be careful not to twist or cross over the cables when installing them.
1.
To install, carry out the removal steps in reverse order.