BUS Updated 12/2011
07/2011
2-1015
WorkCentre 5335 Family Service Documentation
AC Power RAP
Status Indicator RAPs
Initial Issue
AC Power RAP
BSD-ON:
BSD 1.1 - Main Power on (1of2)
BSD-ON:
BSD 1.2 - Main Power on (2 of 2)
Initial Actions
•
Ensure that Power is available at the customer’s receptacle.
•
If the GFI Breaker is tripped, reset the breaker. If it trips again check the AC circuit for a
short circuit.
Procedure
Plug in the Power Cord, then turn the Main Power Switch ON. AC line Voltage is measured
at the GFI Breaker between
P/J10
pin 1 and pin 2 (
BSD 1.1 - Main Power on (1of2)
).
Y
N
Disconnect the power cord. AC line voltage is measured at the outlet.
Y
N
Inform the customer that there is no power to the outlet, check the customer’s
Breaker.
Check the Power Cord for open circuit and poor contact. If no problems are found,
replace the GFI Breaker (
PL 18.3
).
AC line voltage is measured between
P/J1
pin 1 and pin 3 at the Main LVPS (
BSD 1.2 -
Main Power on (2 of 2)
.
Y
N
AC line voltage is measured at the Main Power Switch between
P/J14
and
P/J15
(
(BSD 1.1 - Main Power on (1of2)
).
Y
N
AC line voltage is measured at the Main Power Switch between
P/J12
and
P/
J13
.
Y
N
Unplug the Power Cord and disconnect J1 on the Main LVPS. Check for open
circuits or poor contacts between:
•
GFI Breaker
P/J10
pin 1 and Main Power Switch
P/J12
.
•
GFI Breaker
P/J10
pin 2 and Main Power Switch
P/J13
.
Make sure that the Main Power Switch (
PL 18.1
) is operating correctly.
Replace the Main Power Switch (
PL 18.1
).
Unplug the Power Cord and disconnect
P/J1
on the Main LVPS. Refer to (
BSD 1.2 - Main
Power on (2 of 2))
and check for an open circuit or poor contacts between:
•
Main Power Switch
P/J14
and Main LVPS
P/J1
pin 3.
•
Main Power Switch
P/J15
and Main LVPS
P/J1
pin 1.
AC line voltage is measured at the Finisher Outlet between
P/J16
and
P/J17
(
BSD 1.2 -
Main Power on (2 of 2)
).
Y
N
Turn the power off and unplug the Power Cord.
•
Check Fuse F001 (20A/250V) on the Main LVPS is not open.
•
If the fuse is OK, check for open circuits or poor contacts between:
Main LVPS
P/J3
pin 5 and Finisher Outlet
P/J16
.
Main LVPS
P/J3
pin 2 and Finisher Outlet
P/J17
.
Turn the power off and unplug the Power Cord. Check that Fuse F002 (8A/250V) on the Main
LVPS is not open.
A
A