BUS Updated 12/2011
07/2011
4-49
WorkCentre 5335 Family Service Documentation
REP 6.9, REP 6.10
Repairs & Adjustments
Initial Issue
Figure 2 Belt Installation
3.
Take note of the following points when installing the Carriage Motor.
(1) Attach the spring.
(2) Loosely affix the Carriage Motor that comes attached with a belt.
(3) Move the carriage to fit the belt.
(4) Secure the Carriage Motor to the Main Unit.
4.
After installing the Carriage Motor, move the Full Rate Carriage back and forth and check
that it is moving smoothly.
REP 6.10 IIT PWB
Parts List on
PL 1.6
Removal
NOTE: Backup the data before replacing the PWB (
GP 3
) When restoring the data, first down-
load the backup and then perform the firmware upgrade (
GP 3
and (
GP 16
) Downloading Soft-
ware.
CAUTION
Static electricity may damage electrical parts. Always wear a wrist band during servicing. If a
wrist band is not available, touch some metallic parts before servicing to discharge the static
electricity.
1.
Switch off the power and disconnect the power cord.
2.
Remove the IIT Rear Cover (
Figure 1
)
(1) Remove the cover.
(2) Disconnect the connectors (x2).
(3) Remove the screws (x2).
(4) Remove the IIT Rear Cover.
Figure 1 IIT Rear Cover Removal
3.
Disconnect the connectors that are connected at the rear side to the IIT PWB (
Figure 2
)
(1) Unlock to disconnect the Connector (P7191).
(Do not pull out the Harness directly.)
(2) Move the block of the Connector Housing in the direction of the arrow and dis-
connect the Flat Cable.
(3) Release the hook and disconnect the connector.
(4) Disconnect the connectors (x5).