
4.
Battery Connect Indicator
If battery back-up has been installed, this green lamp will be
lit (the lamp is marked BACO).
5.
Battery Charge Indicator
This yellow lamp (marked BACH) is lit when the mains
cable is connected to the mains supply and the main switch
is switched on (see point 13 further on in this list) indicating
that the battery charge is ongoing.
6.
Outlet Tube
The spent dialysis
fl
uid
fl
ows out from the machine via this
tube.
2:32
AK 96
®
Operator's Manual - Machine Description
HCEN12239 Revision 12.2010
Program version 3.xx
Summary of Contents for AK 96
Page 2: ......
Page 6: ...This page is intentionally left blank HCEN12239 Revision 12 2010 Program version 3 xx ...
Page 263: ...This page is intentionally left blank HCEN12239 Revision 12 2010 Program version 3 xx ...
Page 265: ...This page is intentionally left blank HCEN12239 Revision 12 2010 Program version 3 xx ...
Page 315: ...This page is intentionally left blank HCEN12239 Revision 12 2010 Program version 3 xx ...
Page 317: ...This page is intentionally left blank HCEN12239 Revision 12 2010 Program version 3 xx ...