
The procedure continues with the priming phase. The menu
changes into
ACTIVE PHASE:PRIMING
.
If the function check is still ongoing,
WAITING FOR FCH
will
be displayed. Wait until the menu changes to
CONNECT FLUID TUBES TO DIALYZER
, then
continue to the next point.
7. The blood pump automatically stops before the
fi
rst
fl
ush
phase starts and this menu is displayed on the Information
Display. The operator is requested to attach the dialysis
fl
uid
tubes to the dialyzer if this has not previously been done.
See "Dialysis Fluid Tubes - Attach", page 4:35 in part 1 for
instructions on how to attach the tubes.
Invert the dialyzer
so that the dialyzer will be
fi
lled from
bottom to top to ensure proper de-airation.
8. Press the
fl
ashing
Fluid bypass button
.
The dialysis
fl
uid will now enter the dialyzer when the dialyzer
path on the Flow Diagram lights up green. Especially note that
the dialyzer should be
fi
lled from bottom to top to ensure proper
de-airation.
9. Press the
fl
ashing
Blood pump button
to restart the blood
pump and to continue the procedure.
4:48
AK 96
®
Operator's Manual - Double Needle Treatment
HCEN12239 Revision 12.2010
Program version 3.xx
Summary of Contents for AK 96
Page 2: ......
Page 6: ...This page is intentionally left blank HCEN12239 Revision 12 2010 Program version 3 xx ...
Page 263: ...This page is intentionally left blank HCEN12239 Revision 12 2010 Program version 3 xx ...
Page 265: ...This page is intentionally left blank HCEN12239 Revision 12 2010 Program version 3 xx ...
Page 315: ...This page is intentionally left blank HCEN12239 Revision 12 2010 Program version 3 xx ...
Page 317: ...This page is intentionally left blank HCEN12239 Revision 12 2010 Program version 3 xx ...