
6. When the dwell time
has passed, an attention is given to
indicate that the Rinse/Drain sequence can be started.
Make sure that no more chemicals are left in the central water
supply system:
7. Start the rinse/drain program by pressing the
Rinse/Disinfection button
and select
RINSE
(the button
lights up).
8. When the rinse/drain program is complete and the machine
has been drained, the
Priming button
starts to
fl
ash.
9. The machine can be preset to automatically switch off after
a complete chemical disinfection program, i.e. when the
Priming button
is
fl
ashing, by an authorized technician.
CAUTION
After the Chemical disinfection procedure a test for residues must
have been performed prior to connecting to a patient.
CAUTION
HCEN12239 Revision 12.2010
Program version 3.xx
AK 96
®
Operator's Manual - Hygiene and Maintenance
8:33
Summary of Contents for AK 96
Page 2: ......
Page 6: ...This page is intentionally left blank HCEN12239 Revision 12 2010 Program version 3 xx ...
Page 263: ...This page is intentionally left blank HCEN12239 Revision 12 2010 Program version 3 xx ...
Page 265: ...This page is intentionally left blank HCEN12239 Revision 12 2010 Program version 3 xx ...
Page 315: ...This page is intentionally left blank HCEN12239 Revision 12 2010 Program version 3 xx ...
Page 317: ...This page is intentionally left blank HCEN12239 Revision 12 2010 Program version 3 xx ...