UPS Installation for SCC1 EPN A-Carrier Cabinet
Task List: Install UPS
SI Installation and Upgrades
787
June 2004
Return to Task List
Make the Remaining Connections
Return to Task List
For a fiber-remoted SCC EPN, see
Figure 304, UPS for Fiber-Remoted SCC1 EPN,
on page 788. For a
DS1-remoted SCC EPN and associated CSUs, see
Figure 305, UPS for DS1 Remoted SCC1 EPN,
on
page 789.
1
Plug the 700A8 plug into the Z3A2 UPS alarm adapter.
2
Connect the alarm adapter to the UPS DB25 RS-232 serial port connector.
3
Connect the wires from the plug to the 110 cross-connect field for the AUX connector (see
Table
42, Wire Connections,
on page 787 and
Figure 306, Enlarged View of the 110 Cross-Connect
Field for the AUX Connector,
on page 790).
If connecting a UPS for a DS1-remoted SCC1 EPN:
4
Plug the CSU(s) used in the A-level DS1 converter into the UPS.
Figure notes
1
700A8 plug
2
Clear cover for 700A8 plug
3
Utility fail wire pair
4
UPS fail wire pair
Table 42: Wire Connections
700A8 Plug
DEFINITY AUX Connector 110
Field
UPS Alarm
Name
Pins
Pins
External Alarm Name
Pair 1:
Utility Fail Alarm
1
Connects to
1
1M
Major Alarm Pair
2
2
Pair 3:
UPS Fail Alarm
5
3
1m Minor Alarm Pair
6
4
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...