G3iV4 to Avaya Communication Manager
Task List: G3iV4 to Avaya Communication Manager
SI Installation and Upgrades
87
June 2004
Run acceptance tests [from G3V4]
Return to Task List
Run any acceptance tests that are appropriate for this upgrade. The acceptance tests are listed in these 3
checklists:
Test single-carrier cabinet systems
Test multi-carrier cabinet systems
Test telephones and other equipment
For details of the tests, see
Test the System
Test Telephones and Other Equipment
Test single-carrier cabinet systems
1
Check System Status for Each Cabinet
2
Check Circuit Pack Configuration
3
Test Time Division Multiplexing Bus in Processor Port Network
4
Test Tone-Clock Boards
5
Test Expansion Interface Circuit Packs
6
Test Time Division Multiplexing Bus for Each Expansion Port Network
7
Test Tone-Clock for Each Expansion Port Network
8
Test Tone-Clock Interchange for Each Expansion Port Network
9
Test Expansion Interface Exchange for Each Expansion Port Network
10
Check Circuit Pack Configuration
11
Save Translations, if Required
Test multi-carrier cabinet systems
1
Check System Status for Each Cabinet
2
Check Circuit Pack Configuration
3
Test TDM Bus in PPN
4
Test Tone-Clock Circuit Packs
5
Test SPE Duplication Memory Shadowing Link
6
Test Duplicated Switch Processing
7
Element Interchange
8
Test Expansion Interface Circuit Packs
9
Test TDM for each EPN
10
Test Tone-Clock for each EPN
11
Test Tone-Clock Interchange for each EPN
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...