Install and Connect SCC1 (Single-Carrier Cabinets)
Task List: Install a J58890CG DC Power Distribution Unit
SI Installation and Upgrades
377
June 2004
Figure 114: Typical DC Power Connections
:
Figure notes
1
System Cabinet Stack
2
DC Power Cabinet
3
White Wires
4
Green Ground Wires and Black Wires
Connect to the -48 VDC Return Bus
5
-48 VDC Bus
6
Connect White Wires to Circuit
Breakers
7
DC Power Cable (H600-436, G1) to Power
Connector on Each Cabinet. Cut to Length
and Crimp a Ring Terminal Onto Each
Wire
8
30 Feet (9 m) Maximum
9
Route Cables Through Sliding Door
10
Circuit Breaker
11
Supplied #10-32 Screw, #10 Star Washer,
and #10-32 Hex Nut
12
Inset Showing DC Power Connector
(Male)
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...