Install and Connect SCC1 (Single-Carrier Cabinets)
Connect Time Division Multiplexing Bus Cables
386
SI Installation and Upgrades
June 2004
Figure 120: Connections for Standard Reliability Systems
Return to Task List
High or Critical Reliability PPN - Two Cabinet Stack
Return to Task List
1
Remove the Time Division Multiplexing (TDM) Bus Terminator from Slot 18 of Control Cabinet
A (Processor Port Network (PPN)) and move it to Slot 18 of Control Cabinet B. See
Figure 121,
Connections for High or Critical Reliability Systems,
on page 387.
Figure notes
1
AHF110 TDM Bus Terminator (Slot 17)
2
TDM/Local Area Network (TDM/LAN)
Pinfield (Slot 00)
3
TDM Bus Cable WP-91716 L3
4
Port Cabinet (Standard Reliability)
5
Control Cabinet A Position
6
AHF110 TDM Bus Terminator (Slot 03)
7
Slot 18
3
3
3
7
4
4
4
5
1
2
2
2
6
tdm_cab2 CJL 030696
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...