Adjuncts and Peripherals
DS1/T1 CPE loopback jack
SI Installation and Upgrades
821
June 2004
5
End the test. Enter
test ds1-loop location end cpe-loopback-jack-test.
6
Wait about 30 seconds for the DS1 to reframe on the incoming signal and clear DS1 facility
alarms.
Restoring DS1 administration
1
At the management terminal, open the DS1 administration form. Enter
change ds1 location
.
2
Change to page 2 of the DS1 administration form.
3
Change the value of the
TX LBO
field to the original value that you wrote down when you were
Administering the DS1 for the test
on page 819.
4
Press Enter to make the changes, CANCEL to quit without changes.
Releasing the DS1 circuit pack
1
Release the DS1 circuit pack. From the management terminal, enter
release board location
.
2
Leave the loopback jack in place.
Testing the DS1 span from the smart jack to
the network interface termination or fiber
multiplexer (MUX)
1
Have the service provider run a smart-jack loopback test against the network interface wiring that
links the smart jack to the CO (section 3 in
Figure 315
through
Figure 317
).
2
If the tests fails, there is a problem on the network side. Have the service provider correct it.
Condition
Solution
Loopback termination fails with
an error code of 1313.
The span is still looped somewhere, possibly at the loopback
jack, at the ICSU, or somewhere in the network.
The red LED on the loopback jack
is on.
Replace the ICSU, and re-run the test.
Loopback termination still fails.
Replace the DS1 circuit pack, and repeat the test
The DS1 cannot frame on the
incoming span’s signal after the
loopback jack power down.
There is something wrong with the receive signal into the
loopback jack from the dumb block or the smart jack.
The span failed the service
provider’s loopback test.
The problem is in the service provider’s network.
The service provider successfully
loop tested the span, up to the
smart jack.
The wiring between the loopback jack and the smart jack is
suspect. Test, and make repairs, as needed.
You cannot locate and repair the
problem in the time available and
must terminate the test.
The test will not terminate normally in the absence of a good
framing signal. You have to reset the circuit pack. Enter
reset board location
.
The test terminated normally.
Proceed with
Restoring DS1 administration
.
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...