Install and Wire Telephones
Three-Pair and Four-Pair Modularity
514
SI Installation and Upgrades
June 2004
Three-Pair and Four-Pair Modularity
Return to Task List
Figure 198, 3-Pair and 4-Pair Modularity,
on page 514 is from the port circuit pack to the voice or data
terminal. Refer to
Install Telecommunications Cabling
on page 403 for descriptions of 3- and 4-pair
modularity and distribution.
Most terminals connect to an information outlet (modular jack) installed at the work location. Make the
connections from the port circuit pack to the modular jacks, as shown in
Figure 198, 3-Pair and 4-Pair
Modularity,
on page 514. Then, plug the terminal into the modular jack.
Adjunct Power Connection Locations
on page 515 shows three methods of connecting adjunct power.
Figure 198: 3-Pair and 4-Pair Modularity
Return to Task List
Figure notes
1
Port Circuit Pack
2
System Cabinet Connector Pins
(3-Pair Modularity)
3
Main Distribution Frame (MDF)
Pins
(3-Pair Modularity)
4
Input to Information Outlet (4-
Pair Modularity)
5
Adjunct Power
6
Output From Information Outlet
(4-Pair Modularity)
7
Voice or Data Terminal Pins
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...