Install Additional Hardware
Add Packet Bus Support
588
SI Installation and Upgrades
June 2004
Save Translations (CallVisor ASAI)
Return to Task List
1
If the system is high or critical reliability, type
status system 1
and press Enter
to verify that the
system is in the
active/standby
mode.
2
Type
save translation
and press Enter. This instructs the system to take all translation
information in memory and write it to the translation cards.
3
Update backup translation cards, if required.
Add Packet Bus Support
Return to Task List
You may need to add packet bus support when adding ISDN - BRI or CallVisor ASAI port circuit packs.
NOTE:
Installing TN570D expansion interface circuit packs as part of adding packet bus support
requires a service interruption. Give the customer advance notice of the scheduled
addition.
Task List: Add Packet Bus Support
•
Disable Alarm Origination (Packet Bus Support)
on page 589
•
Save Translations (Packet Bus Support)
on page 589
•
Power Down Cabinet (Packet Bus Support)
on page 589
•
Install Circuit Packs (Packet Bus Support)
on page 589
•
Power Up System (Packet Bus Support)
on page 590
•
Test the Packet Bus and C-LAN Circuit Pack (Packet Bus Support)
on page 592
•
Resolve Alarms (Packet Bus Support)
on page 592
•
Enable Scheduled Maintenance and Alarm Notification (Packet Bus Support)
on page 592
•
Save Translations (Packet Bus Support)
on page 593
If installing TN570D Expansion Interface circuit packs as part of adding packet bus support, then service
is interrupted. Notify the customer in advance as to when the addition will be carried out.
If not installing TN570D circuit packs, then service is not interrupted and you can skip to
Install Circuit
Packs (Packet Bus Support)
on page 589
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...