System 75 Small-Cabinet to R8si (Blowback)
Task List: System 75 Small Cabinet to R8si
SI Installation and Upgrades
315
June 2004
The results of system tests display on the monitor.
3
Verify that all tests pass.
If any of the terminal messages indicate a test has failed or if the message
spe down mode
is
displayed, refer to Maintenance for Avaya DEFINITY® Server SI (555-233-123) to clear the
trouble.
4
Type
set time
and press Enter.
See
Figure 87
.
5
Enter the date information and the time in 24-hour format. Enter either
daylight saving time
or
standard time
, depending on the current time in your time zone. If your area does not use
daylight saving time, set the value of
Daylight Savings Rule
to 0; otherwise, set
Daylight Savings Rule
to 1. Press Enter to set the date and time and ensure that the
system boots properly.
Figure 87: Typical Date and Time Screen
Return to Task List
Enable customer option and alarm origination [75 small upgrade]
Return to Task List
NOTE:
This procedure requires an init login.
If the upgrade is after hours, coordinate with the regional CSA to have the features turned on.
DC
1
At the DC Battery Cabinet (if installed), set the circuit
breaker to ON.
2
At the DC Power Cabinet, set the circuit breaker(s) on the
rectifiers to ON.
This starts the system initialization and test. Some red
LEDs may be turned on, but they are turned off during the
boot-up process. No action is required.
DATE AND TIME
DATE
Day of the Week: Tuesday Month: June
Day of the Month: 26 Year: 2000
TIME
Hour: 20 Minute: 30 Second: XX Type: standard
Daylight Savings Rule: 1
System
Steps
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...