System 75 XE to R8si (Blowback)
Task List: System 75 XE to R8si
SI Installation and Upgrades
273
June 2004
Figure 69: Locations of ground plate and cable clamps on single-carrier cabinet
Return to Task List
Power up and set date, time, and daylight savings rule [75 XE upgrade]
Return to Task List
CAUTION:
It may be necessary to reseat circuit packs. To prevent damage from static electricity,
always wear an Electromagnetic Compatibility (EMC) wrist strap (comcode 900698226)
when handling all system components.
NOTE:
To prevent unnecessary trouble tickets, do not enable the system alarms (Alarm
Origination feature) until all installation and administration procedures are completed.
1
Verify that the write switch on the Translation Flash-Memory Card (translation card) is positioned
down so the card can be written to. Install the R8si translation card into the TN794 circuit pack in
the direction indicated by the arrow on the label.
NOTE:
If the system is high or critical reliability, power up the EPN cabinet first, then the PPN
cabinet. Always power up the control cabinet last.
2
Power up the AC- or DC-powered system.
REAR VIEW
CABLE
CLAMPS
GROUND
PLATE
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...