G3V4vs/R5vs/R6vs to Avaya Communication Manager
Task List: DEFINITY vs to Avaya Communication Manager
150
SI Installation and Upgrades
June 2004
Install TDM/LAN bus terminators [from
G3V4vs/R5vs/R6vs]
Return to Task List
1
Install the 2 AHF110 TDM/LAN bus terminators in slots 02 and 20 of the cabinet (see
Location of
TDM/LAN bus terminators
).
Figure 5: Location of TDM/LAN bus terminators
Return to Task List
Swing existing system into maintenance
position [from G3V4vs/R5vs/R6vs]
Return to Task List
1
While lifting on the left side of the existing cabinet, allow the left side to swing outward and to the
right.
Figure notes
1
Rear of control cabinet
2
TDM/LAN bus terminator in slot 22
3
TDM/LAN bus terminator in slot 02
22
21
00
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
23
scdf01a CJL 081396
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...