Install and Administer Trunks
Add TN1654 DS1 Converter (r only)
682
SI Installation and Upgrades
June 2004
Return to Task List
Installing TN1654s in a Port Carrier
Return to Task List
1
Install the TN1654 circuit pack in any slot in a Port Carrier close to a TN570D Expansion
Interface circuit pack.
2
On the backplane, connect a 14-inch (35.56 cm) Y cable from the TN1654 circuit pack to the
TN570D circuit pack. See
Figure 276, DS1 Converter Connections — Part 1,
on page 683.
3
The Y cable used with the TN1654 is different than the Y cable used with the TN574. These
cables are NOT interchangeable.
4
Connect an H600-348 Quad cable to the other side of the double-headed Y cable.
5
Skip to
Connecting Through a Channel Service Unit
on page 685.
Examples of typical settings
Switch Settings
Description
T1 ESF
Span A through D Framing set for ESF
T1 D4
Span A through D Framing set for D4
E1 120 ohms ESF
Span A through D Line Impedance set for ESF
1 2 3 4 5 6
swdft1es KLC 092799
1 2 3 4 5 6
swdft1d4 KLC 092799
1 2 3 4 5 6
swdfe1es KLC 092799
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...