System 75 XE to R8si (Blowback)
Task List: System 75 XE to R8si
268
SI Installation and Upgrades
June 2004
Figure 65: Critical Reliability fiber-optic connections (remote)
Return to Task List
Install ground plate(s) [75 XE upgrade]
Return to Task List
Use this procedure to install the ground plates only for systems without earthquake protection.
(See
Figure 66, Locations of ground plate cabinet clip and battery,
on page 269.)
1
Working from the rear of the cabinets, replace the upper and lower covers, but do not tighten the
screws.
NOTE:
Critical-reliability Release 8si rear covers for the control cabinets need 2 detents, 1 for the
TDM/LAN cable, and 1 for the ICC cables.
2
Place the ground plate over the lower rear cover of the upper cabinet so that the 4 screws that
attach the lower rear cover go through the 4 ground-plate keyhole slots.
3
Slide the ground plate down over the upper rear cover of the lower cabinet so that the 4 screws
that attach the upper rear cover of the lower cabinet go through the 4 lower ground-plate slots.
TX
RX
2
3
1
2
1
4
RX
4
3 TX
1
1
2
2
4
3
4
TX
RX
RX
TX
PPN
PPN
EPN
EPN
CROSS-CONNECT FACILITY
100A
LIU
100A
LIU
CABINET B
OPTIC
CABLES
CABINET B
LIGHTWAVE
TRANSCEIVERS
LIGHTWAVE
TRANSCEIVERS
OPTIC
CABLES
SLOT 1B01
SLOT 2B02
CABINET A
SLOT 2A01
CABINET A
3
SLOT 1A01
FIBER- FIBER-
9823-TYPE
FL2P-P-XX FL2P-P-XX
9823-TYPE
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...