Install Telecommunications Cabling
MDF Cross-Connect Fields
406
SI Installation and Upgrades
June 2004
Figure 136: Example MDF Connections (MCC1-Multicarrier Cabinet)
MDF Cross-Connect Fields
Each Main Distribution Frame (MDF) contains a trunk/auxiliary field and a distribution field. The
trunk/auxiliary field contains three cross-connect areas:
•
The green field terminates the network interface leads from the Central Office (CO) and provides
the terminals to cross-connect the leads to the purple or yellow fields as required. A single row of
the 110-type terminal block can terminate twenty-four 1-pair, eight 3-pair, or twelve 2-pair trunks.
•
The purple field terminates the trunk circuits from the system with
WP-90929, List 1 or 3 concentrator cables. Also, 25-pair cables can be used to terminate trunk
circuits from the system with each trunk circuit pack connecting to one 25-pair row of the 110-
type terminal block. Each terminal block row can terminate twenty-four 1-pair, eight 3-pair, or
twelve 2-pair trunks.
•
The yellow field provides cross-connect terminals for all miscellaneous leads from the system,
such as alarm monitors, emergency transfer relay power, and attendant console power. This field
is used for emergency transfer wiring, paging equipment, music sources, and so forth.
widfccf3 KLC 020802
4
1
10
19
4
13
22
2
11
20
5
14
23
3
12
21
6
15
24
9
18
7
16
25
8
17
Port Tie Trunk
4 Port Tie Trunk
w/ E&M Signaling
Port Data Line
8
Port Digital
8
Port BRI
12
Port Hybrid
8
Port DID
8
Port Analog
Port CO
8
8
1
10
19
4
13
22
2
11
20
5
14
23
3
12
21
6
15
24
9
18
7
16
25
8
17
Port Digital
24
24/32
16
Port Analog
Port Analog
16
24
Port Digital
Channel DS1
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...